Fresh codes, checked daily. — get them first with free deal alerts
Hama TV Hi-Fi Headphones Over Ear Stereo Long Lead 2m Cable With Volume Control - Black / Grey
Boxed2me Boxed2me

Hama TV Hi-Fi Headphones Over Ear Stereo Long Lead 2m Cable With Volume Control - Black / Grey

£17.52
Get Deal
SKU
10656689422682
Availability
In stock
Last updated
Jul 16, 2026

Product description

The closed design of the Hama TV headphones eliminate external disturbances to ensure that you can enjoy music or TV audio in uninterrupted comfort. Compatible with a range of hi-fi systems and televisions in addition to PCs and other devices supporting a 3.5mm audio jack, the units also comes complete with a 6.35mm adapter for further connection to stereo systems, mixing boards etc.  Plush ear cushions surround the ears, offering excellent long-wear comfort during extended viewing (i.e. films) and listening sessions, whilst the adjustable padded headband permits a flexible fit to a variety of users and head sizes to prevent rubbing and discomfort. A gold-plated plug and contacts ensure low contact resistance for optimum signal transmission and high-quality playback. Extra-long cable (2 m), especially designed for connecting to TVs or HiFi systems  Single-sided cable for the ultimate music experience with more freedom of movement The closed circumaural headphones block out disturbing noise and keep music inside Padded headband for a comfortable listening experience also over long periods of use The headphones are equipped with an individually adjustable headband which adapts to the shape of your head Includes a gold-plated adapter for connecting the headphones to a stereo system, mixing board, etc with a 6.35 mm audio output The gold-plated coating of the plug ensures secure signal transmission for improved audio quality Colour Black/Silver Line  Shell4TV Connectivity (Connection) Connection 3.5 mm Jack Plug/6.35 mm Jack Plug Size & Weight Cable Length 2 m Speaker Diameter 40 mm Electrospecific Properties Frequency Range 20 Hz - 20 kHz Impedance 32 Ω Field of Application Recommended Use Hi-Fi or TV/Mobile Music/Mobile Phone Physical Properties Design Over-Ear Material Plastic Material Model Stereo Sensitivity 113 dB/ mW

When you buy through links on SavingFly we may earn a commission. Learn more.

More from Boxed2me

?>